...
首页> 外文期刊>AACE International Transactions >Finding the Elusive Measured Mile: Unconventional Case Studies
【24h】

Finding the Elusive Measured Mile: Unconventional Case Studies

机译:寻找难以捉摸的测量英里:非常规案例研究

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The measured mile method (including the baseline method) is generally the most preferred approach to prove and quantify lost productivity in construction projects, yet applying the method can be challenging. The measured mile method uses project specific data to compare the actual productivities on identical or similar work between unimpacted or least impacted and impacted periods or segments of a project. The application of the measured mile method is often abandoned due to the lack of suitable productivity data, difficulties in proving similar work, and sometimes unclear distinction between the unimpacted or least impacted and impacted periods or segments. This paper demonstrates, through case studies, the techniques used by the authors to apply the measured mile method when it may intuitively appear inapplicable. It is hoped that practitioners will be inspired by the ideas discussed in this paper and learn innovative applications for the measured mile method.
机译:所测量的 英里 方法 (包括 基线法 )通常为 证明 和 建设项目 量化 生产力损失 ,但 实施该方法 可以 是具有挑战性 的最 优选的方法 。 所测量的 英里 方法 使用项目 特定 数据 unimpacted 或 至少 影响,并且 影响 项目的 周期或 段之间 的实际 生产率 上 相同 或类似的工作 进行比较。 所测量的 英里 方法的应用 通常被 废弃 ,由于缺乏 合适的 生产率数据 , 在证明 类似的工作 的困难, 和 unimpacted 或 至少 影响,并且 受影响的 周期或 片段之间 的区别 不清楚 有时 的 。 本文演示 , 通过案例研究 , 作者所使用 的技术 应用 时,它 可以直观地 显示 不适用 的 测量 方法 英里 。 我们希望 学员 将 在 本文中讨论的 思想 得到启发 和 学习 的 测量 方法 英里的 创新应用 。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号