Wet-Dry Technology to Abate the Visible Plume From An Existing Cooling Tower

机译:湿式干燥技术从现有的冷却塔上减轻可见羽毛

获取原文
获取原文并翻译 | 示例
           

摘要

In 2015, Alliant Energy (owner) undertook a test project to reduce the visible plume and its associated negative consequences in one cell, cell #4, of a 10 cell cooling tower at a combined cycle power plant located in Wisconsin. Not only was the plume severely reducing visibility at an adjacent Operations Center, causing yard operations to be suspended at times for safety, buticing also occurred on the parking lot and walkways, causing safety concerns. Additionally, plume would reduce visibility on a well-traveled country road north of the facility, and on heavy fog days, the plume would drift over the neighborhood located to the north-east of the plant, causing ice to form on resident's driveways and walkways.
机译:2015年,Alliant Energy(所有者)承担了一个测试项目,以减少一个细胞中的可见羽流和其相关的负面后果,在一个位于威斯康星州的组合循环发电厂的10个细胞冷却塔中的一个细胞集电池#4。 不仅是羽毛在邻近运营中心的可见度严重降低了,导致院子际操作有时会暂停,以便安全,也发生在停车场和走道上,造成安全问题。 此外,羽流会降低设施北部的旅行乡村道路上的能见度,并在沉重的雾天上,羽流会漂移到植物东北部的邻居,导致植物的车道和走道形成冰块 。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号