TUMUT 3 POWER STATION THEN AND NOW

机译:Tumut 3电站然后现在

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Located in Talbingo, NSW, it was the first pumped storage hydroelectric power station in Australia. Forty-seven years later, the structure is still a very important functioning power station for the Snowy Mountains Hydro-Electric Authority, and the following extract from our 1973 Awards Program outlines why it is still in great condition: The Power Station contains six hydraulic turbine generating units and three pumps, each of the turbines having a generating capacity of 250,00 kW and each of the pumps being able to raise 954 m3 of water per second against a head of 155 m. It has an overall length of 154 m, a width of 22.5 m and a height of 59.6 m and 106,038 m3 of reinforced concrete was used in its construction.
机译:位于新南威尔士州塔尔宾馆,是澳大利亚的第一个抽水储存水电站。 四十七年后,该结构仍然是雪山水电管理局的一个非常重要的功能电站,以及我们1973年奖项计划的以下提取纲要概述了为什么它仍处于大状态:电站含有六个液压涡轮机 产生单元和三个泵,每个涡轮机具有250,00 kW的发电容量,并且每个泵能够将每秒升高954m3的水,而抵靠155米的头部。 它的整体长度为154米,宽度为22.5米,高度为59.6米和106,038m3的钢筋混凝土。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号