Custom Milling and Consulting, Inc. is increasing its processing capabilities. CMC has added a new 36,000 sq. ft. building to their facilities, 12,000 sq. ft. of the that space has been dedicated for increasing wet milling production. Work is progressing on the processing area which includes; a new dust collection system, electrical stations with enough capacity to operate up to 1,000 total HP of equipment, and 300 square feet of refrigerated storage. An indoor tank farm will be outfitted with new tanks for large volume production; an automated filling station will be installed to improve batch accuracy, and a 90 ton chiller for products that require precise temperature control.
展开▼