首页> 外文期刊>Cleaning & restoration >MY MOST CHALLENGING PROJECT
【24h】

MY MOST CHALLENGING PROJECT

机译:我最具挑战性的项目

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The project was a Category 1 water loss in a university hospital outpatient wing.A 2-inch braided stainless steel hot water supply line ruptured in the ceiling above a teaching lab on the second floor.The local shut-off valve was located near where the line ruptured and could not be accessed due to the water temperature,which was over 200 degrees Fahrenheit.Because of this,the water could not be immediately shut off,and a large amount of water was released.Approximately 40,000 square feet on the first and second floors were affected.The first floor consisted of the loading dock,shipping,receiving,maintenance shop,hazardous materials storage and other support services.Affected areas on the second floor included over 40 offices and administrative rooms,the blood bank,multiple clinical and research labs,and three teaching areas.
机译:该项目是一家大学医院门诊翼的1类毒品损失。在二楼的教学实验室上方的天花板上面破裂了2英寸编织不锈钢热水供应线。本地关闭阀位于附近 线破裂,无法通过水温进行,这是超过200度的华氏度。因为这一点,水无法立即关闭,并且释放大量的水。第一和第一个水有大量的水。 第二层受到影响。一楼由装载码头,运输,接收,维护店,危险材料储存等支撑服务组成。二楼的3种广泛的地区包括40多个办事处和行政房间,血库,多个临床和 研究实验室和三个教学领域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号