EVERYONE UNDERSTOOD the criticality of this project.The leaking,abused caustic tank required replacement.Tank inspectors had given us no more than five years and the tank has sprung two leaks since inspection.Yet,something as mundane as a tank replacement rarely gets priority over sexier projects especially when it involves a lot of money(over $2 million if we went with every option proposed).Indeed,despite the clear need,someone at the plant suggested we let an engineering firm do a study.I’d already spent months in scope development,so this seemed to be throwing money away.Instead,I suggested a staged project.We’d proceed in steps: first,develop the tank design,then build the pad and,finally,install the equipment and pipeline.Construction would extend over several months.We’d use consultants but only in tactical,targeted ways.I think a major reason for over-runs is because work is rushed and unplanned.With a staged project,you stop work when an obstacle appears and don’t restart until you’ve found a good solution.
机译:每个人都了解这个项目的关键性。泄漏,滥用腐蚀性罐需要更换。坦克检查员没有超过五年,而坦克自检验以来跑了两次泄漏。yet,因为油箱更换是平凡的,坦克替代的东西很少有优先事项尤其是涉及大量资金的性感的项目(如果我们通过拟议的每种选择超过200万美元)。虽然需要明确的需求,但工厂的某人建议我们让工程公司进行学习。我已经花了几个月在范围开发中,所以这似乎扔掉了钱。我建议了一个分阶段项目。我们进入步骤:首先,开发坦克设计,然后建立垫,最后,安装设备和管道。构建将延伸几个月。我们使用顾问,但只有在战术,有针对性的方式。我认为过度运行的一个主要原因是因为工作被冲动和计划。在一个阶段的项目中,你在出现障碍物时停止工作't重新启动unti我找到了一个很好的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号