首页> 外文期刊>Chemical Processing >Quash Commissioning Quandaries Problems in testing a tank underscore larger issues
【24h】

Quash Commissioning Quandaries Problems in testing a tank underscore larger issues

机译:Quash调试酶促在测试坦克的问题下划线较大的问题

获取原文
获取原文并翻译 | 示例
           

摘要

REVAMP COMMISSIONING The troubleshooting request fails to mention the pressure/vacuum relief system configuration and the vessel vacuum rating,nor specify explicitly whether this is an over-pressure rupture or a tear from vacuum collapse.The problem statement implies it could have been either.Regardless,formal constraints for under-and over-pressure are needed during the commissioning/startup phase.In other words,the steam supply crosstie to the vessel and the method to limit flow/pressure would be established by engineering calculation and the connections,depressuriza-tion,padding and vents sized and specified in the commissioning/startup procedures,so that the relief system is not overwhelmed,unsafe conditions are prevented and commissioning steps are of an acceptable duration.Even if not required by process safety management,consider a rigorous safety review(process hazard analysis)of the commissioning procedures following a standard methodology.
机译:修改调试故障排除请求未能提及压力/真空释放系统配置和血管真空额定值,也没有明确指定这是否是过压破裂或真空崩溃的撕裂。问题陈述意味着它可能是..Regartless ,在调试/启动阶段期间需要进行欠压和过压的正式约束。在其他单词中,蒸汽电源串联到船舶和限制流量/压力的方法将通过工程计算和连接,减免 调试/启动程序中规模和指定的填充和通风口,使浮雕系统不被淹没,防止不安全的条件和调试步骤具有可接受的持续时间。即使过程安全管理不需要,请考虑严格的安全性 审查(过程危险分析)在标准方法后调试程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号