Resource leveling in construction projects with activity splitting and resource constraints: a simulated annealing optimization

机译:活动分裂与资源约束的建设项目中的资源调平:模拟退火优化

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Overtime and over-budget construction projects are not pleasant to any stakeholder. Stakeholders want construction projects to be completed without delay and excessive cost. It is possible to meet these objectives by using resource management techniques such as resource leveling. Due to the limitation of resources and different types of them in a construction project, optimizing the resource utilization is crucial. In this paper, a meta-heuristic simulated annealing resource leveling model is presented. The novelty of this model lies not only in the type of modeling and optimization but also in its assumptions. Our model simultaneously allows activities to split and considers a limitation in resource availabilities. The developed model was implemented in a computer program. Then, it was applied to an example from the literature of resource leveling. The model successfully solved the problem. The results of our model are compared with those already available in the literature.
机译:加班和过度预算建设项目对任何利益相关者都不愉快。 利益相关者希望毫不拖延地完成建设项目,并且成本过高。 可以使用资源管理技术(如资源调平)满足这些目标。 由于资源和不同类型的建设项目中的不同类型,优化资源利用率至关重要。 本文介绍了荟萃启发式模拟退火资源调平模型。 该模型的新颖性不仅在于建模和优化类型,而且还在其假设中。 我们的模型同时允许拆分活动并考虑资源可用性的限制。 开发的模型是在计算机程序中实现的。 然后,它应用于资源调平文献的示例。 该模型成功解决了这个问题。 我们模型的结果与文献中已有的模型进行比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号