首页> 外文期刊>Building Engineer >CROSS REPORTS Report 902
【24h】

CROSS REPORTS Report 902

机译:交叉报告报告902

获取原文
获取原文并翻译 | 示例
       

摘要

The safety concept that has wide application is known as leak before break. All structures are prone to degradation. Proper management requires routine inspection to detect the onset of damage before this becomes hazardous. This report demonstrates that when designing for structural safety, a holistic view of the design should be taken. It may be that there was a maintenance issue with blocked outlets, but this possibility should have been considered and suitable overflows provided, it seems to be yet another symptom of divided responsibilities on projects, with no overall view of the impacts of the building design on the structural response.
机译:具有广泛应用的安全概念被称为休息前的泄漏。 所有结构都容易降解。 适当的管理需要常规检查在危险之前检测损坏的发作。 本报告表明,在设计结构安全时,应采取设计的整体视图。 可能存在封闭网点的维护问题,但这种可能性应该被考虑并提供适当的溢出,它似乎是对项目的责任又是另一个责任的症状,没有完整的建筑设计影响的视野 结构反应。

著录项

  • 来源
    《Building Engineer》 |2020年第9期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号