Multi-Attribute Utility Model for Quantifying Schedule and Cost Overruns in Pipe-line Projects

机译:多属性实用程序模型,用于量化管道项目中的进度和成本超支

获取原文
获取原文并翻译 | 示例

摘要

Schedule overrun and cost overrun are key factors that might cause failure of construction projects. This paper presents a multi-attribute utility model (MAU-PL) designed to quantify the attributes that cause schedule and cost overruns in pipe-line construction projects. All the attributes that impact the schedule and cost overrun have been reviewed from literature review. The most important attributes have been identified by interviewing experts in the field. Those attributes were organized in a hierarchal fashion utilizing Analytical Hierarchy Process (AHP) in order to obtain the relative weight of importance of these attributes. Multi-Attribute Utility Theory (MAUT) is used to develop a utility function for each attribute The developed MAU-PL model represents a component of a decision support system (DSS-PL), dedicated to assess the risk associated with the schedule and cost overruns in pipe-line construction projects. A hypothetical example is presented to illustrate the main features and characteristics of the developed MAU-PL model. Schedule overrun and cost overrun are key factors that widely exist in construction projects. These are risky dilemmas that might cause conflicts between owners and contractors where claims arise. Investigation of the factors affecting schedule delays and cost overruns for the construction projects has attracted the interest of many researchers and practitioners. Considerable efforts have been exerted to recognize and classify the factors causing schedule delays and cost overruns. These efforts include: Fisk [7], Majid and McCaffer [9], Ismail [8], Mullholand and Christian [11], Eyers and McCabe [6], and Nasir et al. [12].
机译:进度超支和成本超支是可能导致建设项目失败的关键因素。本文提出了一种多属性效用模型(MAU-PL),旨在量化导致管道建设项目进度和成本超支的属性。影响进度和成本超支的所有属性已从文献综述中进行了审查。采访该领域的专家已经确定了最重要的属性。为了获得这些属性重要性的相对权重,这些属性使用层次分析法(AHP)以层次结构进行组织。多属性效用理论(MAUT)用于为每个属性开发效用函数。已开发的MAU-PL模型代表决策支持系统(DSS-PL)的组件,专用于评估与进度和成本超支相关的风险在管道建设项目中。给出了一个假设的例子来说明所开发的MAU-PL模型的主要特征。进度超支和成本超支是建设项目中广泛存在的关键因素。这些都是危险的困境,可能会导致索赔发生时业主与承包商之间的冲突。对影响建设项目进度延迟和成本超支的因素的研究引起了许多研究人员和从业人员的兴趣。为了识别和分类造成计划延误和成本超支的因素,人们付出了巨大的努力。这些工作包括:Fisk [7],Majid和McCaffer [9],Ismail [8],Mullholand和Christian [11],Eyers和McCabe [6],以及Nasir等。 [12]。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号