Practical EVMS for an EPC Project

机译:EPC项目的实用EVMS

获取原文
获取原文并翻译 | 示例

摘要

The purpose of this paper is to present a practical approach on how an earned value management system (EVMS) is applied by contractor for an EPC (Engineering, Procurement, and Construction) Turn-key Lump-sum project in the process industry. The primary objective of project execution is to complete the project within an approved budget and schedule. One powerful tool to satisfy this objective is the EVMS which is well known, but not widely used. In each phase of engineering, procurement and construction, it provides practical solutions i11 the following three steps; one is to develop work breakdown structure (WBS) incorporating control accounts (CA) along with cost coding system, which enables integrated project control; next is to establish progress measurement system; and the last is to report the project status the key points are how to establish control accounts and manage unpaid actual cost against the work actually performed or committed.
机译:本文的目的是提供一种实用的方法,说明承包商如何将加值管理系统(EVMS)应用于流程行业的EPC(工程,采购和建筑)总包一次性总付项目。项目执行的主要目标是在批准的预算和进度内完成项目。 EVMS是实现这一目标的强大工具,它是众所周知的,但并未得到广泛使用。在工程,采购和施工的每个阶段,它通过以下三个步骤提供实用的解决方案;一种是开发结合了控制帐户(CA)和成本编码系统的工作分解结构(WBS),从而实现集成的项目控制。其次是建立进度测量系统。最后是报告项目状态,关键是如何建立控制账户并针对实际执行或承诺的工作管理未付的实际成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号