首页> 外文期刊>ABB Review >Guri Dam: Modernization of the Guri hydroelectric plant's control protection and instrumentation system
【24h】

Guri Dam: Modernization of the Guri hydroelectric plant's control protection and instrumentation system

机译:古里水坝:古里水电站现代化的控制保护和仪表系统

获取原文
获取原文并翻译 | 示例
           

摘要

In 2005, ABB was awarded a contract to design, supply and install the unit control, protection and instrumentation systems for the Guri Hydroelectric Plant, Venezuela's largest supplier of hydroelectric power. The plant is located in the Nekuima Canyon, 100km upstream from the confluence of the Caroni and Orinoco rivers. The modernization project, which will extend the plant's life by 30 years, is being carried out by a three-way consortium comprising ABB Venezuela, ABB Canada and ABB Switzerland. First delivery is scheduled for January 2007.
机译:2005年,ABB赢得了委内瑞拉最大水电供应商古里水电站设计,供应和安装机组控制,保护和仪表系统的合同。该工厂位于Nekuima峡谷,距卡罗尼河和奥里诺科河汇合处上游100公里。现代化项目将延长工厂的使用寿命30年,由ABB委内瑞拉,加拿大ABB和瑞士ABB组成的三方财团进行。首次交付定于2007年1月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号