首页> 外文期刊>ABB Review >A mine of efficiency - ABB is helping extend the life of the massive Aitik copper mine by making it more efficient
【24h】

A mine of efficiency - ABB is helping extend the life of the massive Aitik copper mine by making it more efficient

机译:高效的矿山-ABB通过提高效率来帮助延长大型Aitik铜矿的寿命

获取原文
获取原文并翻译 | 示例
       

摘要

Some 1,000 km north of Stockholm, Sweden, past the Arctic Circle, lies an impressive open-pit copper mine, known as Aitik. Although the proportion of metal found at the Aitik copper mine is low - less than 0.3 percent - it is a highly profitable mine because it is run so efficiently. In fact, operations have recently become even more efficient - a $790 million modernization of the entire mining operation has enabled the mine operator Boliden to double its production capacity and extending the life of the mine to 2030. ABB has contributed to this success by supplying a range of products and systems to power and operate the entire site.
机译:瑞典北极以北约1000公里处,经过北极圈,坐落着一座令人印象深刻的露天铜矿,称为Aitik。尽管在Aitik铜矿中发现的金属比例很低(不到0.3%),但由于其运行效率很高,因此它是高利润矿山。实际上,最近的运营效率更高-整个采矿业务的7.9亿美元现代化改造使矿山运营商Boliden的生产能力翻了一番,并将矿山的使用寿命延长至2030年。为整个站点供电和操作的一系列产品和系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号