...
首页> 外文期刊>AACE International Transactions >Goal Orientated Risk Management Practices For Construction Projects
【24h】

Goal Orientated Risk Management Practices For Construction Projects

机译:建设项目的目标导向型风险管理实践

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This paper addresses the benefits of augmenting a project's management program with specific goal orientated risk management tasks during the pre-construction and construction phases. These tasks are applicable to owners, designers and contractors. This paper presents how to identify and manage the goal orientated, contract-based risks inherent in contract requirements, cost estimates and schedules; risks that are not addressed through insurance. The techniques and tasks learned here can assist in the equitable and timely resolution of issues that would otherwise adversely impact the success of a project. This paper explores: - The criteria for a successful project from each party's perspective. - Project success goals and why a comprehensive understanding of them by the entire management team is critical. - The advantages of reviewing project procedures and practices early. - Key requirements for estimates and preliminary scheduling that allow for later evaluation and preclude disputes. - The difference between allowances and contingencies, why both should be re-evaluated over time and when these evaluations should take place. - What elements are evaluated in a review of contractor schedules. And, - The importance of "real time" resolution of potential disputes.
机译:本文探讨了在施工前和施工阶段通过以目标为导向的特定风险管理任务来增强项目管理计划的好处。这些任务适用于所有者,设计师和承包商。本文介绍了如何识别和管理合同要求,成本估算和进度计划固有的,以目标为导向,基于合同的风险;保险无法解决的风险。此处学习的技术和任务可以帮助公平,及时地解决可能对项目成功产生不利影响的问题。本文探讨:-从各方的角度来看成功项目的标准。 -项目成功目标以及整个管理团队全面理解这些目标的重要性至关重要。 -尽早审查项目程序和实践的优势。 -估算和初步计划的关键要求,以便以后进行评估并避免纠纷。 -备抵金和或有事项之间的差异,为何应随时间重新评估两者以及何时进行这些评估。 -在审查承包商时间表时评估了哪些要素。并且,-实时解决潜在纠纷的重要性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号