...
首页> 外文期刊>The TEX Report >Cameroon FLNG Project to Expand LNG Production before This Year End
【24h】

Cameroon FLNG Project to Expand LNG Production before This Year End

机译:喀麦隆流行项目在今年之前扩大液化天然气生产

获取原文
获取原文并翻译 | 示例
           

摘要

LNG production volume at FLNG “Hilli Episeyo” which is serving a Cameroon-based LNG project is expected to increase by the end of 2019. The vessel’s owner Golar LNG reported it is negotiating with charterers Perenco and SNH and the two companies may exercise their option to expand their use of the vessel’s liquefaction capacity. Hilli Episeyo is Golar’s first converted FLNG converted from an LNG tanker. The vessel has four liquefaction units with a total capacity of 2.4 million mt a year. Perenco and SNH are using just two trains with a capacity of 1.2 mtpa under a liquefaction tolling deal with Golar LNG, and the remaining two trains are unused.
机译:在FLNG“Hilli Episesyo”的LNG生产量,即服务于基于喀麦隆的LNG项目,预计将增加2019年底。船长的老板Golar LNG报告说它与租船员展会谈判,这两家公司可以行使其选择 扩大他们对船舶的液化容量的使用。 Hilli Episeyo是Golar首次转换从LNG油轮转换的FLNG。 该船只有四个液化单位,每年总产能为240万吨。 Perenco和SENH在液化令与Golar LNG达成协议下,只需两列火车容量为1.2 MTPA,并且剩下的两列火车未被使用。

著录项

  • 来源
    《The TEX Report》 |2019年第12134期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号