...
首页> 外文期刊>The International Journal of Advanced Manufacturing Technology >Cycle time reduction in outsourcing process: case of an Indian aerospace industry
【24h】

Cycle time reduction in outsourcing process: case of an Indian aerospace industry

机译:外包过程的循环时间减少:印度航天工业的情况

获取原文
获取原文并翻译 | 示例
           

摘要

This paper reports a case study of an Indian aerospace industry, XYZ Aeronautics Limited, with an objective to bring reduction in cycle time of outsourcing process. The focus is to identify bottleneck areas and investigate into the improvement opportunities. The paper enriches the present body of knowledge by contributing a methodology and its application for a real-life case study to understand the implications of outsourcing on operational planning. The analysis reported in this research is based on the available knowledge and extensive experience gained while working in the outsourcing department of the case organization for a long period of time. The research integrates action research, longitudinal case study research, and simulation for the detailed and scientific analysis of the problem for a case organization. The study employs a six-step analysis approach for investigating the outsourcing-related issues in case organization. The simulation study has helped to reduce the average cycle time of purchase order placement to 69 days, i.e., improvement by 33.65% over the present 104 days. This would enable the case organization to conduct "what-if" analysis and evaluate the implications of bringing improvements in select bottleneck areas for reducing cycle time of outsourcing process. The investigation is expected to help managers to negotiate on appropriate dimensions with vendors and convince them for the adoption of e-sourcing, e-contract, and e-catalog technologies.
机译:本文报告了对印度航天工业,XYZ航空公司有限公司的案例研究,目的是降低外包过程的循环时间。重点是识别瓶颈区域并调查改进机会。本文通过促进方法和应用,以实现现实案例研究来丰富现状,以了解外包对业务规划的影响。本研究报告的分析基于在案例组织的外包部门工作的可用知识和广泛的经验,长期工作。该研究整合了行动研究,纵向案例研究和模拟,为案例组织进行了详细和科学分析。该研究采用了六步分析方法,以调查在案件组织中的外包相关问题。仿真研究有助于将采购订单安置的平均周期时间减少到69天,即,在本期104天内提高33.65%。这将使案例组织能够进行“什么 - 如果”分析,并评估在选择瓶颈区域的改进以减少外包过程的循环时间的影响。预计调查有望帮助管理人员在与供应商的适当方面谈判,并说服他们采用电子采购,电子合同和电子产品目录技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号