首页> 外文期刊>TEX Energy Report >Peabody Energy and Glencore to Set up JV within Year
【24h】

Peabody Energy and Glencore to Set up JV within Year

机译:皮博迪能量和格伦兰在年内建立JV

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

On July 31 local time, Peabody Energy Corporation, USA made clear its plan to set up United Wambo jointventure (JV) with Glencore plc within the year 2019.Both companies will end up promoting United Wambo JV project in the State of NSW, Australia through UnitedWambo JV.United Wambo JV project aims to integrate Wambo open-cut coal mine Peabody Energy operates in the HunterValley region in the State of NSW and Glencore’s United coal mine adjoining this coal mine, and make a blanket develop-ment of both coal mines and unexplored mining areas in the vicinity of both coal mines, of which United coal mine hasbeen placed on care & maintenance condition since the year 2010.
机译:7月31日当地时间,Peabody Energy Corporation,USA明确计划在2019年内与Glencore PLC建立联合华美·普(JV)的计划。博士公司将最终推动澳大利亚南威尔士州南威尔士州的联合华博合作项目 Unitedwambo Jv.Umbo JV项目旨在将沃博开关煤矿皮博迪群岛融合在南威尔士州南威尔士州新南方州的亨特瓦尔利地区,并毗邻这座煤矿,并制作煤矿的毯子和 煤矿附近的未开发矿区,其中曼联煤矿已在2010年自2010年以来的护理和维护条件下。

著录项

  • 来源
    《TEX Energy Report》 |2019年第3886期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号