首页> 外文期刊>U.S. Coal Review >Arch stops Mountain Laurel longwall 3 months early
【24h】

Arch stops Mountain Laurel longwall 3 months early

机译:拱门早早停止山地Laurel Longwall

获取原文
获取原文并翻译 | 示例
       

摘要

Arch Coal said Friday that it has discontinued longwall operations at its Mountain Laurel mine in Logan County, W.Va., three months earlier than planned. “The move is expected to reduce Arch’s fourthquarter coking coal volumes by between 150,000 and 200,000 tons and its fourth-quarter operating results by approximately $20 million versus previous expectations,” the company stated. Arch previously disclosed that Mountain Laurel had encountered challenging geologic conditions in its final longwall panel.
机译:星期五拱门煤炭表示,它在洛根县的山地劳雷尔矿区停产了LongWall行动,比计划早3个月。 “预计该举措将减少拱门的第四次焦化煤炭卷在150,000至20万吨之间,第四季度经营结果约为2000万美元,而以前的预期”,该公司表示。 拱门以前透露,山地月桂树在最终的长墙板中遇到了具有挑战性的地质条件。

著录项

  • 来源
    《U.S. Coal Review》 |2019年第2299期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 煤矿开采;
  • 关键词

  • 入库时间 2022-08-19 18:37:48

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号