首页> 外文期刊>Platt's Oilgram News >Enterprise portion of large Wink-to-Webster Pipeline system comes online from Permian
【24h】

Enterprise portion of large Wink-to-Webster Pipeline system comes online from Permian

机译:大型Wink-to-Webster管道系统的企业部分来自Permian

获取原文
获取原文并翻译 | 示例
       

摘要

Houston-The Enterprise Products Partners portion of the massive Wink-to-Webster Pipeline system has come online from the Permian Basin to move crude oil volumes to refining and export hubs near Houston. Enterprise's newly completed, 450,000 b/d Midland-to-ECHO 3 pipeline will tie into the larger, ExxonMobil-operated Wink-to-Webster system that will transport up to 1.5 million b/d when it's completed by mid-2021. The big pipeline system is expected to be the last, major crude long-haul pipeline system built from the Permian for a few years now that pipeline capacity has far exceeded muted production volumes during the coronavirus pandemic.
机译:休斯顿 - 企业产品合作伙伴部分的大规模眨眼行车管道系统从二叠纪盆地上市,将原油卷转移到休斯顿附近的炼油和出口枢纽。 企业的新完成,450,000 B / D Midland-to-Echo 3管道将绑定到较大的exxonmobil操作的眨眼之间,它将在2021年中期完成时运输到150万b / d。 预计大型管道系统将成为最后几个年份的主要原因,目前冠状病毒大流行期间的管道能力远远超过了静沉沉的产量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号