...
首页> 外文期刊>Platts Metals Daily >UK gold miner Centamin misses 2019 production target
【24h】

UK gold miner Centamin misses 2019 production target

机译:英国金矿工迎场未命中2019年生产目标

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Johannesburg—British mining company Centamin’s full-year 2019 gold production from its Sukari gold mine in Egypt increased 1.7% year on year to 480,529 oz, even as it missed its guidance range of 490,000- 520,000 oz, with all-in sustaining costs up 7% on the year at $943/oz, the company said Thursday. The London-listed company said fourth- quarter gold production rose 8% year on year and up 51% quarter on quarter to 148,387 oz due to improved feed grade, metallurgical recoveries and year-end plant drawdown of gold-in-circuit, with all-in sustaining costs down 2% year on year at $792/oz on increased sales volumes.
机译:Johannesburg-British-British-Blishing Company Centamin的2019年全年黄金生产从其伊卡里金矿同比增长1.7%至480,529盎司,即使它错过了490,000-520,000盎司的指导范围,全体持续成本7 该公司周四表示,百分比为943美元/盎司。 伦敦上市公司表示,由于饲料等级,冶金回收率和金融渠道的年终植物缩减,季度的第四季度黄金产量同比增长8%,同比增长51%至148,387盎司。 - 在增加销售量增加792美元/盎司的成本下降了2%的成本下降了2%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号