...
首页> 外文期刊>PetroChemical News >Dialog Updates on Progress of Phase 3 Of Pengerang Deepwater Terminals
【24h】

Dialog Updates on Progress of Phase 3 Of Pengerang Deepwater Terminals

机译:Pengerang深水终端第3阶段进展的对话

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Johor-Dialog Group said it has begun construction of a storage terminal, common tankage facilities and deepwater marine facilities for Phase 3 of the Pengerang Deepwater Terminals in Singapore. Phase 3 will include more dedicated petroleum and petrochemical storage terminals for medium- to long-term customers. It will support various downstream operations, including those of the refinery and petrochemical plants within the Pengerang integrated petroleum complex. An expected start-up date was not given.
机译:Johor-Dialog Group表示,它已经开始建造了新加坡Pengerang深水码头第3阶段的存储码头,公共油箱设施和深水海洋设施。 第3阶段将包括更多专用的石油和石化储存终端,用于中期长期客户。 它将支持各种下游业务,包括炼油厂内的炼油厂和石化植物,综合石油复合物。 未给出预期的启动日期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号