...
首页> 外文期刊>PetroChemical News >Ineos Postpones FPS Project in the UK
【24h】

Ineos Postpones FPS Project in the UK

机译:INEOS推迟FPS项目在英国

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

London— Ineos, responding to requests from customers, has decided to delay the shutdown of its Forties Pipeline System (FPS) until August at the earliest. The FPS, which has been a long-time feedstock suppler to Ineos at its Grangemouth complex in the UK, was planned to be shut down on 16 June 2020 for an upgrade to the system.
机译:伦敦 - ineos回复客户的要求,决定在最早的8月延迟其独特管道系统(FPS)的关闭。 该FPS已在英国格兰茅斯复合体ineinos的长期原料供应商,计划于2020年6月16日关闭,以便升级到系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号