首页> 外文期刊>SBB Steel Markets Daily >Brazil's Vale gradually bringing back spare iron ore pellet capacity
【24h】

Brazil's Vale gradually bringing back spare iron ore pellet capacity

机译:巴西的Vale逐渐带回备用铁矿石颗粒容量

获取原文
获取原文并翻译 | 示例
           

摘要

Brazilian miner Vale, the world’sbiggest iron ore pellet producer, is graduallybringing back spare pelletizing capacity afterachieving a large hike in premiums to someAtlantic and Asian contract buyers, includingpartners.Vale moved back the restart of its Sao Luispellet plant in northern Brazil, which is closeto high-grade Carajas iron ore supplies, tosometime in the third quarter.
机译:世界上有纤维的铁矿石生产商巴西矿工谷正在逐渐打击备用造粒能力,以散发出优质的寄宿费,以便在北方巴西北方的北方罗拉特植物重新启动其北方的船舶 Closeto高档Carajas铁矿石用品,第三季度的仪表仪。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号