首页> 外文期刊>SBB Steel Markets Daily >ArcelorMittal Poland to keep Krakow met coke plant operating
【24h】

ArcelorMittal Poland to keep Krakow met coke plant operating

机译:arcelormittal波兰保持克拉科夫遇到焦炭工厂

获取原文
获取原文并翻译 | 示例
           

摘要

London—Steel group ArcelorMittal said Nov. 5 the metallurgical coke plant in Krakow, Poland, will keep operating along with other downstream steel rolling facilities as the blast furnace and steel plant permanently close due to weaker demand related to coronavirus. In an investor presentation, ArcelorMittal said the coke plant, two rolling mills, hot-dipped galvanizing and new organic coating line at Krakow will continue to operate, with slabs supplied from its Dabrowa Gornicza mill, also in Poland.
机译:伦敦钢铁集团Arcelormittal表示,11月5日表示,波兰克拉科夫的冶金焦厂将随着与冠状病毒的需求较弱而永久关闭的高炉和钢铁厂将继续与其他下游钢轧机。 在投资者介绍中,ArcelorMittal表示,克拉科夫的焦炭厂,两种轧机,热浸镀锌和新的有机涂层线将继续运行,在波兰的Dabrowa Gornicza Mill提供的板块。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号