首页> 外文期刊>SBB Steel Markets Daily >More European steel mills cut output, AM Bremen idles a blast furnace
【24h】

More European steel mills cut output, AM Bremen idles a blast furnace

机译:更多欧洲钢厂削减输出,am不来梅闲置高炉

获取原文
获取原文并翻译 | 示例
           

摘要

London—More European steel mills announced Friday they are ramping down production as a direct consequence of decreased demand and further restrictions on public life in Europe, with ArcelorMittal Bremen idling a blast furnace. ArcelorMittal Germany gave more detail Friday on its decreased output in Germany and said that it had idled one of its two blast furnaces at the flat steel plant in Bremen. The now idled BF had just been restarted in the beginning of January. The annual capacity of the plant is 3.6 million mt of crude steel. The steelmaker also slowed down production at its coking plant Bottrop and reduced working hours at its Eisenhuettenstadt flat steel operations.
机译:伦敦更多欧洲钢厂星期五宣布,他们正在升高,作为对欧洲公共生活的需求和进一步限制的直接后果,漫画不来梅怠速炉。 ArcelorMittal Germany Frids Firs Firds Filly关于其在德国的产量下降,并表示它在不来梅的扁平钢铁厂闲置了它的两种高炉。 现在刚刚闲置的男朋友刚刚在1月初重新开始。 该工厂的年产能为360万吨粗钢。 钢铁制造商在其焦化工厂的工厂的生产中还减缓了其Eisenhuettenstadt扁钢操作的工作时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号