首页> 外文期刊>SBB Steel Markets Daily >elga coal miner powers up toward higher production
【24h】

elga coal miner powers up toward higher production

机译:ELGA COMP矿工向更高的生产权力提升

获取原文
获取原文并翻译 | 示例
           

摘要

Elga coking coal complex in Yakutia, Russia’s Far East, has started introducing powerful quarry machinery with a view to ramp up output following its transition to centralized power supply and away from diesel-driven generation. Elga, part of Russian mining and steel company Mechel, is deploying high-yield mining and conveyor equipment. So far, it has bought a powerful open-mine excavator and the first walking scoop dredge. Elga’s coal washing plant also is now powered from Russia's national grid, a spokeswoman for Mechel told S&P Global Platts Wednesday.
机译:Elga炼焦煤层在俄罗斯远东雅库蒂亚,已开始引入强大的采石机械,以便在转向集中电源和远离柴油驱动的一代后升空输出。 Elga,俄罗斯矿业和钢铁公司Mechel的一部分,正在部署高产采矿和输送设备。 到目前为止,它还购买了一个强大的开放式挖掘机和第一个步行铲船。 Elga的煤炭洗涤厂现在也来自俄罗斯国家电网,Mechel发言人周三告诉标准普尔全球普拉特。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号