...
首页> 外文期刊>SBB Steel Markets Daily >Vale iron ore output may reach 400 million mt within three years
【24h】

Vale iron ore output may reach 400 million mt within three years

机译:Vale铁矿石产量在三年内可能达到4亿吨

获取原文
获取原文并翻译 | 示例
           

摘要

Brazilian miner Vale sees the possibility of reaching the 400 million mt iron ore output levels within two to three years, Chief Financial Officer Luciano Siani Pires said Friday. “Considering the 90 million mt that are currently standing, a third of it is related to Brucutu, another third is related to the dry operations of Alegria, Timbopeba and Vargem Grande, and the other third is related to wet mining,” said Siani Pires during an earnings conference call.
机译:Luciano Siani PIRES周五表示,巴西矿工Vale看到两至三年内达到4亿吨铁矿石产量水平的可能性。 “考虑到当前站立的9000万吨,其中三分之一与布库劳德有关,另一个三分之一是与Alegria,Timbopeba和Vargem Grande的干旱操作有关,而另一个第三个与湿采机有关,”Siani Pires说 在盈利会议期间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号