...
首页> 外文期刊>SBB daily eBriefing >Vale ore output may reach 400 million mt in a few years
【24h】

Vale ore output may reach 400 million mt in a few years

机译:谷矿石产量在几年内可能达到4亿吨

获取原文
获取原文并翻译 | 示例
           

摘要

Brazilian miner Vale sees the possibility of reaching the 400 million mt iron ore outputlevels within two to three years, Chief Financial Officer Luciano Siani Pires said Friday.“Considering the 90 million mt [difference], a third of it is related to Brucutu, another thirdis related to the dry operations of Alegria, Timbopeba and Vargem Grande, and the otherthird is related to wet mining,” said Siani Pires during an earnings conference call.
机译:巴西矿工Vale在星期五表示,卢西亚诺·西安岛露天官员在两到三年内看到了达到4亿吨铁矿石Outputlevels的可能性。“考虑到9000万吨[差异],其中三分之一与Brucutu有关 第三次与阿尔博利亚,蒂姆波波和瓦尔格兰德的干旱业务有关,另一个是与湿采矿业有关,“Siani Pires在盈利会议期间说。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号