首页> 外文期刊>Nefte Compass >Nord Stream 2 Warns of Large Delay Cost
【24h】

Nord Stream 2 Warns of Large Delay Cost

机译:nord Stream 2警告大延迟成本

获取原文
获取原文并翻译 | 示例
           

摘要

The Nord Stream 2 company admit- ted last week that a several month- long delay could lead to additional costs of several hundred million eu- ros for the €9.5 billion ($10.6 bil- lion) gas pipeline project. The Gazprom-led 55 Bcm/yr pipeline from Russia to Germany is scheduled for launch in late 2019 but could be delayed by a slow ap- proval process in Denmark, the only country along the pipeline’s route in the Baltic Sea that hasn’t yet issued a construction permit. Many observers believe that Copenhagen, under US pressure, wants to force Moscow to agree to a new long-term transit deal with Ukraine (NC Aug.1’19).
机译:该北部牛津公司上周承认,几个月长的延迟可能导致额外的成本为€95亿欧元(10.6美元的Bil-Lion)天然气管道项目。 从俄罗斯到德国的Gazprom-Led 55 BCM / YR管道计划于2019年底推出,但可能会延迟丹麦的慢速进程,尚未在波罗的海的波罗的海路线途中唯一的国家 发出建筑许可证。 许多观察家认为,根据美国压力,哥本哈根希望强迫莫斯科与乌克兰(NC 8月1日)同意新的长期过境协议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号