首页> 外文期刊>Nature reviews Cancer >Experimental research on the maximum backwater height in front of a permeable spur dike in the bend of a spillway chute
【24h】

Experimental research on the maximum backwater height in front of a permeable spur dike in the bend of a spillway chute

机译:溢洪道弯道渗透堤防前后高度的实验研究

获取原文
获取原文并翻译 | 示例
       

摘要

Hydraulic experiments on installing a permeable spur dike at three positions (1/4, 1/2, and 3/4) on the concave bank of the bend of a spillway chute with three angles (45 degrees, 60 degrees and 75 degrees) were carried out for studying the backwater condition in front of the permeable spur dike. Results show that the maximum backwater height occurs at the cross-section where the permeable spur dike meets the concave bank of the bend. A formula for the maximum backwater height was derived by the employment of the principle of momentum conservation, and the formula indicates that the height is influenced by the geometric parameters of the permeable spur dike and the bend, the layout of the spur dike in the bend, and the inflow discharge. Based on experimental data, a regression analysis was implemented on the water depth coefficient in the formula. Furthermore, the maximum backwater height can be obtained through the water depth at the concave bank of the end of bend when the parameters and installing pattern of the permeable spur dike are determined.
机译:上在三个位置(1/4,1/2,和3/4)与三个角度(45度,60度和75度)一个溢洪道斜槽的弯曲的凹岸安装可渗透丁坝液压实验是在可渗透丁坝的前研究回水条件下进行。结果表明,该最大高度回水发生在横截面,其中所述可渗透丁坝符合弯曲的凹岸。一种用于最大回水高度式被雇佣的动量守恒原理,推导出,和式表示该高度由可渗透丁坝和弯曲,正堤的在弯曲的布局的几何参数的影响以及流入放电。基于实验数据,一回归分析上式中的水深系数实现。此外,可以通过水的深度在弯曲的端部的凹岸时所确定的参数和可渗透丁坝的安装图案所获得的最大回水高度。

著录项

  • 来源
    《Nature reviews Cancer》 |2019年第6期|共10页
  • 作者单位

    Shandong Agr Univ Coll Water Conservancy &

    Civil Engn Tainan 271018 Taiwan;

    Shandong Agr Univ Coll Water Conservancy &

    Civil Engn Tainan 271018 Taiwan;

    Shandong Agr Univ Coll Water Conservancy &

    Civil Engn Tainan 271018 Taiwan;

    Shandong Agr Univ Coll Water Conservancy &

    Civil Engn Tainan 271018 Taiwan;

    Shandong Agr Univ Coll Water Conservancy &

    Civil Engn Tainan 271018 Taiwan;

    Water Resources &

    Fishery Bur Taian City Tai An 271018 Shandong Peoples R China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 肿瘤学;
  • 关键词

    maximum backwater height; permeable spur dike; spillway chute;

    机译:最大的回水高;可渗透的锡克堤;溢洪道斜槽;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号