...
首页> 外文期刊>Metal Bulletin Daily >Vale allowed to resume operations in 30 mln-tpy iron ore mine
【24h】

Vale allowed to resume operations in 30 mln-tpy iron ore mine

机译:允许谷允许在30mln-tpy铁矿石中恢复操作

获取原文
获取原文并翻译 | 示例
           

摘要

A court in Brazil’s southeastern Minas Gerais state has authorizedminer Vale to resume operations at its Laranjeiras tailings dam,connected to the Brucutu iron ore mine, which has capacity for 30million tonnes per year.The court in Belo Horizonte, which is the Minas Gerais statecapital, also ordered the state’s environmental agency, Semad, tocomply with the decision that allows activities at the mine, Valereported on Tuesday March 19.
机译:巴西东南部的法院Minas Gerais州有授权的Vale,以恢复其Laranjeiras Tailings Dam的运营,与Brucutu Iron Ore Mine有关,每年有30milion吨的能力。贝洛··群山的法院,这是Minas Gerais StateCapital, 还订购了该州的环境机构SEMAD,致力于允许在矿山活动的决定,于3月19日星期二举行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号