首页> 外文期刊>Metal Bulletin Daily >INTL LEAD & ZINC CONF: New Century targets fast-track zinc-lead output in optimized tailings project
【24h】

INTL LEAD & ZINC CONF: New Century targets fast-track zinc-lead output in optimized tailings project

机译:INTL领导和锌CONF:新世纪靶向优化尾矿项目的快速镀锌输出

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Junior miner New Century Resources plans to bolster its large-scaletailings operation in Australia, which reprocesses zinc and lead,through the use of advanced technology and logistics, the companytold delegates at Fastmarkets’ International Lead & Zinc conferenceon Monday April 15.The Century mine, located in the state of Queensland about250km northwest of Mount Isa, is an open-pit mine which yieldszinc, lead and silver. It began production in 1999 but was closed inDecember 2015 by former owner MMC, due to depletion of orereserves.
机译:初级矿工新世纪资源计划在澳大利亚加强其大型标枪运营,通过使用先进的技术和物流,通过使用先进的技术和物流,在Fablimars的国际领导和锌会堂,4月15日星期一。世纪矿, 位于昆士兰州大约250km西北部的昆士兰州,是一个露天矿,占用,铅和银。 它于1999年开始生产,但由于Orereserves耗尽,由前所有者MMC被前任所有者关闭2015年的税款。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号