...
首页> 外文期刊>Metal Bulletin Daily >Vale lowers expectations for 2019 sales after Brucutu mine suspended again
【24h】

Vale lowers expectations for 2019 sales after Brucutu mine suspended again

机译:谷谷再次降低2019年销量的预期销售后再次暂停

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Brazil’s Vale is expecting its 2019 iron ore and pellets sales to fallbetween the bottom and the middle of its targeted 307-332 milliontonnes, after a court decided to stop its 30-million-tonne-per-yearBrucutu mine once again.The Minas Gerais Court of Justice has “monocratically decided” tosuspend the effects of the ruling by the Lower Public Treasury Courtof Belo Horizonte in March that authorized the resumption ofactivities at the Laranjeiras tailings dam and the Brucutu mine, theminer said late on Monday May 6.
机译:巴西的Vale预计其2019年的铁矿石和颗粒销售将在其底部和中间的底部和中间的目标后,在法院决定再次阻止其每年300万吨的每年生育矿后。米纳斯吉拉斯法院 大法官“独裁决定”戏剧性裁决贝洛···哈米特队的裁决的影响,旨在恢复洛拉杰西尾矿大坝和布鲁特岛矿区的活动,主题在5月6日星期一晚些时候表示。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号