...
首页> 外文期刊>Gas Matters Today >QP says delayed Qatari gas project ‘due online this year’, unveils huge petchem plan
【24h】

QP says delayed Qatari gas project ‘due online this year’, unveils huge petchem plan

机译:QP表示延迟Qatari天然气项目“今年在线”,推出了巨大的Petchem计划

获取原文
获取原文并翻译 | 示例

摘要

The delays plaguing a major gas project in Qatar seem to have been overcome after Qatar Petroleum’s (QP) CEO announced this week that the Barzan gas project is scheduled to start up by the end of 2019, with the statement coming as company signed a deal with Chevron Phillips to build the largest ethane cracker in the Middle East. The project - originally expected online in 2013 - looks set to finally fire up this year, QP’s CEO Saad Sherida Al-Kaabi was quoted as saying this week. Work on the project by a joint venture between QP and ExxonMobil started in 2011, however progress has been marred by significant technical challenges.
机译:在本周宣布的卡塔尔石油公司(QP)首席执行官宣布,Barzan Gase项目计划于2019年底启动后,延迟似乎已被克服似乎已被克服,并随着公司签署协议,该声明 雪佛龙菲利普斯在中东建造最大的乙烷饼干。 该项目 - 最初预计2013年在线 - 今年终于启动了终于启动,QP的首席执行官Saad Sherida Al-Kaabi被引用如此。 2011年QP和EXXONMOBIL之间的合资企业在项目上工作,但是通过显着的技术挑战,进展已经受到了影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号