首页> 外文期刊>Gas Matters Today >Novatek’s winning streak ends after Yamal T4 delayed ‘by pipe design flaw’ – report
【24h】

Novatek’s winning streak ends after Yamal T4 delayed ‘by pipe design flaw’ – report

机译:Novatek的胜利连续结束,后yamal t4延迟'通过管道设计缺陷' - 报告

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Russia’s LNG champion Novatek has delayed the launch of Yamal LNG’s fourth liquefaction train by several months apparently due to design errors that left pipelines susceptible to brittleness and unsuitable for use in sub-zero Arctic temperatures, according to Russian newspaper Kommersant. The delay to Yamal’s experimental fourth train, which features Novatek’s novel proprietary Arctic Cascade liquefaction technology, breaks Novatek’s string of successes in building Yamal’s first three trains on budget and ahead of schedule.
机译:俄罗斯报纸Kommersant表示,俄罗斯的LNG冠军Novatek延迟了几个月后延迟了几个月的月份的第四个液化火车,显然是由于设计误差,使得易受脆性和不适合在零北极气温中使用的管道敏感。 延迟到山羊的实验第四列火车,其中包括Novatek的新型北极级联液化技术,打破了Novatek在建造山羊的前三列预算之前和提前提前的成功。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号