...
首页> 外文期刊>Gas Matters Today >Manila lifts exploration moratorium in bid to replace maturing Malampaya field
【24h】

Manila lifts exploration moratorium in bid to replace maturing Malampaya field

机译:Manila升降机探索暂停,以取代成熟的Malampaya领域

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Philippines president Rodrigo Duterte has lifted the moratorium on oil and gas exploration in the West Philippine Sea (WPS), with the country’s energy secretary Alfonso Cusi subsequently issuing a “resume-to-work” notice for offshore licence holders. Exploration activity in the WPS has been suspended since 2014 due to territorial disputes with Beijing, however Cusi said the lifting of the moratorium was arrived “in good faith and with full regard of the ongoing negotiations between the Philippines and China”. The order sent the share price of WPS licence holder PXP Energy rocketing.
机译:菲律宾总统罗德里戈·杜特雷举行了野菲律宾海(WPS)的石油和天然气勘探暂停,该国的能源秘书Alfonso Cusi随后向海上执照持有人发出“恢复工作”通知。 由于与北京领土纠纷,WPS的勘探活动已被暂停,然而,Cusi表示,Cusi表示,暂停达到“真诚,充分就菲律宾与中国之间的持续谈判”。 该订单发送了WPS许可证持有人PXP能源飙升的股价。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号