【24h】

Eni can restart Goliat

机译:eni可以重启goliat

获取原文
获取原文并翻译 | 示例
           

摘要

Norway's Petroleum Safety Authority Norway (PSA) has decided Eni Norge has complied with an order to shut down the Goliat field offshore Norway and is now clear to restart production. "The order, which required Eni to cease production from Goliat was issued on 6 October 2017. That followed an audit directed at electrical safety on the field, which took place from 19-28 September. This audit revealed serious breaches of the regulations, and the PSA therefore gave Eni notice of an order on 5 October 2017," said the PSA.
机译:挪威的石油安全局挪威(PSA)已被决定的ENI Norge遵守了一个令人努力关闭Goliat领域挪威,现在很清楚地重启生产。 “订单”要求从Goliat停止生产的秩序于2017年10月6日发布。随后审计了该领域的电气安全,该领域于9月19日至28日举行。这次审计揭示了法规的严重违反法规, 因此,PSA于2017年10月5日给了eni通知订单,“PSA说。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号