...
【24h】

Norway Nova manifolds ready

机译:挪威Nova Fimenolds准备好了

获取原文
获取原文并翻译 | 示例

摘要

Wintershall Dea reports that Aker Solutions has completed two manifolds for the Nova field development off- shore Norway and handed them over to Subsea 7. Subsea 7 will be in charge of the installation of these manifolds on the seabed of the Nova field. The manifolds will be installed during the coming months. The Nova field is being developed as a subsea tieback connecting two templates to the existing Gjoa platform, which is operated by Neptune Energy. Gjoa will process the pro- duction fluids and provide water injection and gas lift to the Nova field.
机译:Wintershall DEA报告说,AKER解决方案已完成挪威的新星现场开发的两种歧管,并将其递给海底7.海底7将负责在新星领域的海底上安装这些歧管。 歧管将在未来几个月内安装。 Nova领域正在开发为将两个模板连接到现有GJOA平台的海底连接,由海王星能量运营。 GJOA将处理生产流体,并为Nova领域提供注水和气体升力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号