Switzerland-based ABB has provided the Trans- Anatolian Natural Gas Pipeline (TANAP) pipeline with its largest ever fully integrated control and security system. ABB’s said that the security, monitoring, and communications technology was installed on the 1,850km TANAP. The first phase, ‘Gas to Eskisehir’ opened in early summer 2018 ahead of schedule. ABB provided the security, telecommunications, SCADA main control room, containerized equipment rooms, and installed the fiber optic cable along the pipeline.
展开▼