Santos and Carnarvon Petroleum are pushing ahead with the development of the Dorado field project offshore Australia “despite recent chal- lenges in the market.” The partners are focusing on starting the Front- End Engineering Design (FEED) as planned.?The Dorado development is located in permit WA-437- P. Santos is the operator with an 80% stake, while Carnarvon holds the remaining 20% interest.
展开▼
机译:Santos和Carnarvon Petroleum正在推动澳大利亚多拉多野外项目的发展“尽管最近在市场上有挑战。” 合作伙伴专注于开始计划的前端工程设计(饲料)。DORADO开发位于允许的允许WA-437- P. Santos是股权的运营商,而Carnarvon则拥有剩下的20%兴趣 。
展开▼