Canada’s Primeline Energy said Thurs- day that it has confirmed a find following a drill-stem testing program for the LS 35- 3-1 exploration well in Block 25/34 off China (IOD Apr.14,p7). Two drill-stem tests were conducted, the second of which yielded data that indicated gas flows at pressures too low to operate the separator or flow meters.
展开▼