...
首页> 外文期刊>Argus Coal Daily International >Bangladeshi coal-fired power projects advance
【24h】

Bangladeshi coal-fired power projects advance

机译:孟加拉国燃煤电力项目推进

获取原文
获取原文并翻译 | 示例

摘要

Bangladesh's plans to build new coal-fired power plants gained momentum last year, having previously lagged its am bitious power development programme. The country's Power System Master Plan (PSMP), published in 2010, forecast total domestic demand to reach 10.2GW by 2015, with coal-fired generation capacity rising by 1.8GW. The actual figures for 2015 showed that Bangladesh had fallen behind schedule, with consumption well below target at 7.8GW. And no new coal-fired capacity was commissioned. But the country made some progress last year.
机译:孟加拉国计划在去年建造新的燃煤电厂的计划,以前落后于其惨淡的电力发展计划。 该国的电力系统总体规划(PSMP)于2010年出版,预计到2015年的国内需求总量达到10.2gW,燃煤发电容量1.8GW。 2015年的实际数据显示,孟加拉国落后于7.8GW的消费远低于目标。 没有委托新的燃煤能力。 但该国去年取得了一些进展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号