首页> 外文期刊>Argus Coal Daily International >Tata Power takes steps to lift Mundra operations
【24h】

Tata Power takes steps to lift Mundra operations

机译:塔塔力量采取措施提升Mundra操作

获取原文
获取原文并翻译 | 示例
           

摘要

Indian utility Tata Power is taking further steps to cut losses at its 4GW imported coal-fired Mundra power project and ensure its future viability. The company is moving ahead to sign supplementary contracts with the western states of Gujarat and Maharashtra — two out of five states that consume electricity from the project — to get a higher tariff, its chief executive Praveer Sinha said yesterday.
机译:印度公用事业塔塔权力正在采取进一步的措施,在其4GW进口燃煤Mundra电力项目中削减亏损,并确保其未来的活力。 该公司正在前进,签署与西部古吉拉特邦和马哈拉施特拉的补充合同 - 其中五分之一的五个国家,其中包括从项目的电力,以获得更高的关税,其首席执行官昨天表示。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号