...
首页> 外文期刊>Argus Coal Daily International >Gdansk port expansion to ease coal bottlenecks
【24h】

Gdansk port expansion to ease coal bottlenecks

机译:格但斯克港口扩张缓解煤瓶颈

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Polish port of Gdansk plans to double rail loading capacity by early-2020 to ease coal import bottlenecks. Operator Port Polnocny is preparing to build a second rail loading facility, a company executive said. The expansion, which should be complete by early 2020, will allow the port to double the number of coal trains it dispatches to 18 a day. Bottlenecks have restricted Gdansk coal throughputs. The port handled almost 7.2mn t of coal last year — roughly half thermal and half coking — up by 40pc on 2017. Almost all of this was imports, with only small volumes of thermal coal re-exported to Scandinavia.
机译:GDANSK的波兰港计划于2020年代早期推出轨道装载能力,以简化煤炭进口瓶颈。 公司高管表示,运营商Pord Polnocny正准备建立第二根轨道装载设施。 应该在2020年代初期完成的扩展将使港口将其派遣到每天18辆的煤列车的数量。 瓶颈已经限制了格但斯克煤炭吞吐量。 该港口去年处理了近720万吨的煤炭 - 大约是2017年40百万的半热量和半焦点。几乎所有这一切都是进口的,只有少量的热煤再出口到斯堪的纳维亚。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号