...
首页> 外文期刊>Argus Coal Daily International >Indonesian output revives as rains ease
【24h】

Indonesian output revives as rains ease

机译:印度尼西亚的产出恢复了降雨安心

获取原文
获取原文并翻译 | 示例
           

摘要

Coal output from Indonesia’s main Kalimantan producing region is slowly resuming with the onset of drier weather. Heavy rainfall in the region in recent weeks has resulted in delays to mining and vessel loading operations at severa mines, and prompted at least two producers of low calorific value (CV) coal — Jhonlin and PCN — to declare force majeure on shipments. Jhonlin has since resumed production of GAR 3,800 kcal/ kg coal but has maintained its force majeure on GAR 4,200 kcal/kg supplies because of a flooded mine. But several shipments of GAR 3,800 kcal/kg coal that had been scheduled to load this month are likely to be delayed until July.
机译:印度尼西亚主要康马坦的煤炭产量正在逐步恢复干燥天气的发作。 该地区最近几周的大雨导致了Severa Mines的采矿和船舶运营延迟,并促使至少两种低热量(CV)煤炭 - jhonlin和PCN--宣布出货量的不可抗力。 jhonlin已恢复生产的GAR 3,800 KCAL / kg煤炭,而是由于洪水挤出,因此在GAR 4,200 KCAL / KG耗材上保持其不可抗力。 但是,在7月至7月,已举行的若干大3,800克尔/千克煤炭的换货3,800千卡/千克煤炭可能会被推迟。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号