首页> 外文期刊>Water Science and Technology >Energy potential and alternative usages of biogas and sludge from UASB reactors: case study of the Laboreaux wastewater treatment plant
【24h】

Energy potential and alternative usages of biogas and sludge from UASB reactors: case study of the Laboreaux wastewater treatment plant

机译:UASB反应器的潜在能源和沼气和污泥的替代用途:Laboreaux废水处理厂的案例研究

获取原文
获取原文并翻译 | 示例
       

摘要

This work assessed the energy potential and alternative usages of biogas and sludge generated in upflow anaerobic sludge blanket reactors at the Laboreaux sewage treatment plant (STP), Brazil. Two scenarios were considered: (i) priority use of biogas for the thermal drying of dehydrated sludge and the use of the excess biogas for electricity generation in an ICE (internal combustion engine); and (ii) priority use of biogas for electricity generation and the use of the heat of the engine exhaust gases for the thermal drying of the sludge. Scenario 1 showed that the electricity generated is able to supply 22.2% of the STP power demand, but the thermal drying process enables a greater reduction or even elimination of the final volume of sludge to be disposed. In Scenario 2, the electricity generated is able to supply 57.6% of the STP power demand; however, the heat in the exhaust gases is not enough to dry the total amount of dehydrated sludge.
机译:这项工作评估了巴西Laboreaux污水处理厂(STP)上流厌氧污泥床反应器中产生的沼气和污泥的能源潜力和替代用途。考虑了两种情况:(i)优先使用沼气对脱水污泥进行热干燥,以及将过量沼气用于ICE(内燃机)的发电; (ii)优先使用沼气发电,并利用发动机废气的热量干燥污泥。方案1显示,所产生的电力能够满足STP电力需求的22.2%,但是热干燥过程可以更大程度地减少甚至消除要处置的最终污泥量。在方案2中,发电量能够满足STP电力需求的57.6%;然而,废气中的热量不足以干燥脱水污泥的总量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号