首页> 外文期刊>The TEX Report >Australian Atlas Iron Secures 6-Mt/a Iron Ore Port Capacity
【24h】

Australian Atlas Iron Secures 6-Mt/a Iron Ore Port Capacity

机译:澳大利亚Atlas Iron确保了6吨/年的铁矿石港口产能

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Australian iron ore developer Atlas Iron Limited announced April 1 that it has successfully secured additional berth capacity at the Utah Point public access port facility in Port Hedland. Atlas is a foundation customer of the Utah Point facility and has previously secured 3 Mt/a of annual capacity to underpin delivery of product from its Pardoo mine. Atlas has now been advised by the Port Hedland Port Authority that it has been allocated an additional 3 Mt/a of capacity for the period from May 2010 to February 2012, increasing its total allocation to 6 Mt/a.
机译:澳大利亚铁矿石开发商阿特拉斯铁业有限公司(Atlas Iron Limited)于4月1日宣布,已成功在黑德兰港的犹他角公共入口港口设施获得了额外的泊位容量。阿特拉斯(Atlas)是犹他州角工厂的基础客户,并且以前已经确保了每年3 Mt / a的能力来支持其Pardoo矿的产品交付。黑德兰港港口管理局现已告知Atlas,从2010年5月至2012年2月,该公司已被分配了额外的3 Mt / a的产能,从而将总分配量增加到6 Mt / a。

著录项

  • 来源
    《The TEX Report》 |2009年第9702期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号