Production at Jinduicheng Molybdenum Mining (JDC) is to decrease in the latter half of 2003, as the company mines ore from a low-grade zone. JDC is to reduce moly concentrate output for 4 months from August, with production falling by 300-400 tonnes per month (est. 0.4-0.5m lb per month of contained Mo). In addition, a 40-day maintenance shutdown is scheduled at an ore dressing plant from August 20 (capacity 400-600 tonnes per month concentrate). As a consequence JDC is not expected to be in a position to sell spot material in August or September The already tight Chinese concentrate market will also see lowered production in some areas with the onset of the rainy season in August and September.
机译:由于该公司从低品位矿区开采矿石,金堆城钼矿(JDC)的产量将在2003年下半年减少。 JDC将自8月起连续4个月减少钼精矿产量,产量每月减少300-400吨(估计每月含钼0.4-0.5百万磅)。此外,计划从8月20日起在选矿厂进行40天维护停机(每月精矿产能为400-600吨)。因此,预计JDC不能在8月或9月出售现货。随着8月和9月雨季的来临,已经很紧张的中国精矿市场还将在某些地区减产。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号