首页> 外文期刊>CRU Monitor: Copper Studies >Bridging the future supply gap: Key barriers to copper mines projects
【24h】

Bridging the future supply gap: Key barriers to copper mines projects

机译:缩小未来的供应缺口:铜矿项目的主要障碍

获取原文
获取原文并翻译 | 示例
           

摘要

Since 2011, we have seen a dramatic contraction in the long term pipeline of copper mine projects aroundthe world as a result of delays, cancellations and downscaling. In this section, we look at the underlyingreasons behind these cutbacks. More specifically, CRU has identified the 5 key barriers which in ourview will stunt the development of the pipeline of copper mine projects in the coming years.
机译:自2011年以来,由于延误,取消和规模缩小,我们发现全球铜矿项目的长期管道急剧收缩。在本节中,我们将探讨这些削减背后的潜在原因。更具体地说,CRU确定了在我们看来将阻碍未来几年铜矿项目管道开发的5个主要障碍。