...
首页> 外文期刊>CRU Monitor: Copper >Price Bonanaza/Supply suffers yet more issues
【24h】

Price Bonanaza/Supply suffers yet more issues

机译:价格Bonanaza /供应遭受更多问题

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Supply-side impediments appear to be on something of a world tour at present - with an itinerary that the UN Secretary General would be proud of. Last month, talk of disruptions remained focused around Chinese smelters (a legacy of the harsh winter); rainfall in Central Africa and upon Southern African power networks, notably Zambia. Weather and power-related problems remain very topical issues. This month, adverse weather has caused a further bout of disruption - with, for example, heavy rain nudging 2008 forecast copper production 10 percent lower at Kagara Limited's Australian operations. Meanwhile, back on the power front, there has been considerable renewed interest and debate on the short-term (and longer-term) energy equation in Chile. Labour disputes have also made a re-appearance this month causing disruption in PNG (Ok Tedi), Zambia (Chambishi) and Chile (El Teniente, San Antonio) to add to the long-term Mexican saga at Cananea. In summary, the overarching message on supply-side disruption is that of the same issues, but different characters.
机译:目前,供应方面的障碍似乎正在世界巡回演出中,联合国秘书长将为此感到自豪。上个月,关于中断的讨论仍然集中在中国冶炼厂(严冬的遗留物)上。中部非洲和南部非洲电网(特别是赞比亚)的降雨。与天气和电力有关的问题仍然是非常热门的问题。本月,恶劣的天气造成了进一步的干扰-例如,Kagara Limited在澳大利亚运营的大雨推动了2008年的预测铜产量将下降10%。同时,回到电力领域,人们对智利的短期(和长期)能源方程式重新产生了兴趣和争论。劳资纠纷在本月也重新出现,造成巴布亚新几内亚(奥克泰迪),赞比亚(印度)和智利(圣安东尼奥的El Teniente)的混乱,加剧了卡纳纳的墨西哥长期传奇。总而言之,关于供应方中断的总体信息是相同问题,但特征不同。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号